Administration (BPA) proposes to allow AT and T to upgrade its telecommunications equipment at its Redland South wireless site, located on structur…
BPA is proposing to allow T-Mobile Wireless access to structure 22/1 along the Sammamish-Maple Valley No. 1 transmission line in King County, WA. T…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…
Battery assembly, battery transportation, battery installation, and battery operation powering a environmental remediation skid.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…
The Nevada National Security Site (NNSS) Management and Operating (M and O) Contractor's Los Alamos Operations (LAO) occupy a single, three-story b…
The proposed actions would include baseline water quality testing in accordance with the U.S. General Services Administration Order PBS1000.7A, Dri…
The scope of work for this task is to Apply FireDam to fix contamination at the Transuranic Waste (TRU) Processing Facility located at Low Activity…
Three gates have gate position and locking pins that require maintenance. The scope of work will include maintenance and modifying the gate locking…
Roof Repair in 702-L…