Replace Big Hill Raw Water Intake System Oil Water Separator Tank with Concrete Tank CX(s) Applied: B1.3 Date: 04/16/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
West Hackberry Building 301 Air Handling Unit-1 Heating, Ventilation, and Air Conditioning Replacement CX(s) Applied: B1.4 Date: 04/16/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Prosser Hatchery Backup Generator Replacement CX(s) Applied: B1.31 Date: 04/16/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Routine Activities at Lakeview, Oregon, Processing and Disposal Sites CX(s) Applied: B1.3, B1.11, B3.1 Date: 04/16/2012 Location(s): Oregon Offices(s): Legacy Management
Power Line Configuration 2013-1 CX(s) Applied: B4.13 Date: 04/15/2012 Location(s): Idaho Offices(s): Nuclear Energy
Redmond-Pilot Butte Number 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 04/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Danger Tree Management on Shiprock-Four Corners 345 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 04/13/2012 Location(s): New Mexico Offices(s): Western Area Power Administration-Rocky Mountain Region
Routine Monitoring, Maintenance and Administrative at the Durango, Colorado Disposal and Former Processing Sites CX(s) Applied: B1.3, B3.1 Date: 04/13/2012 Location(s): Colorado Offices(s): Legacy Management
Routine Activities Associated with the Gasbuggy Site in Northern New Mexico CX(s) Applied: B1.3, B3.1 Date: 04/13/2012 Location(s): New Mexico Offices(s): Legacy Management
A 35 Ton Liquid Argon Prototype Detector Will Be Built in Building PC-4 as a Prototype Detector for the Long Baseline Neutrino Experiment CX(s) Applied: B3.6 Date: 04/12/2012 Location(s): Illinois Offices(s): Fermi Site Office