Distributed Thermoelectric Heating, Ventilation, and Air Conditioning for Vehicle Applications CX(s) Applied: A9 Date: 04/18/2012 Location(s): Michigan Offices(s): National Energy Technology Laboratory
Ohio Advanced Transportation Partnership - North Coast Nissan Electric Vehicle Supply Equipment Installation CX(s) Applied: B5.23 Date: 04/18/2012 Location(s): Ohio Offices(s): National Energy Technology Laboratory
Slipstream Development and Testing of Siemens POSTCAP Capture and Separation Technology CX(s) Applied: B3.6 Date: 04/18/2012 Location(s): Florida Offices(s): National Energy Technology Laboratory
Installation of Retail Biofuel Infrastructure Supporting I-75 Green Corridor Project CX(s) Applied: A1, B5.22 Date: 04/18/2012 Location(s): Georgia Offices(s): National Energy Technology Laboratory
Geotechnical Core Drilling for USGS 138 CX(s) Applied: B3.1 Date: 04/18/2012 Location(s): Idaho Offices(s): Nuclear Energy
Renovation of E-Wing Ventilation, Building 773-A CX(s) Applied: B2.1 Date: 04/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Heating Actinide Materials in a 2.9 volume % Hydrogen Atmosphere Using a Laboratory Furnace in the C-155 Glovebox CX(s) Applied: B3.6 Date: 04/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Harnessing the Hydro-Electric Potential of Engineered Drops in the Columbia Basin Project: Phase 1 CX(s) Applied: A9 Date: 04/18/2012 Location(s): Washington Offices(s): Golden Field Office
Arizona State University - Cyanobacteria Designed for Solar-Powered Highly Efficient Production of Biofuels - Phase II CX(s) Applied: A9, B3.6 Date: 04/17/2012 Location(s): Arizona, Arizona, Arizona, Minnesota, North Carolina Offices(s): Advanced Rese...
Dismantling of 735-A and 735-11A Chillers and Condensers CX(s) Applied: B1.23 Date: 04/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office