Categorical Exclusion (CX) Determinations By Date

Scale Resistant Heat Exchangers for Low Temperature Geothermal Binary Cycle Power Plant CX(s) Applied: A9, B5.2, B5.15 Date: 05/31/2012 Location(s): California Offices(s): Golden Field Office
Upgrade of the Secondary Containment System at Bonneville Power Administration’s (BPA) Santiam Substation CX(s) Applied: B4.6 Date: 05/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Optimization of Microwave Telecommunication System ON Line Nevada Transmission Project, f.k.a. Southwest Intertie Project - South CX(s) Applied: B1.19, B4.6 Date: 05/29/2012 Location(s): Nevada Offices(s): Loan Guarantee Program Office
Establish Laydown Yard Northeast of MOX Services Concrete Batch Plant CX(s) Applied: B1.15 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office