Scaled Saltstone Facility Testing CX(s) Applied: B3.6 Date: 05/29/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
May 29, 2013Scaled Saltstone Facility Testing
CX(s) Applied: B3.6
Date: 05/29/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Tests will be conducted in the Engineering Development Laboratory (EDL, bldg. 786-A) to investigate the abrasive wear of paddles and the inlet auger of the Saltstone Scaled Mixer.
CX(s) Applied: B3.6
Date: 05/29/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Tests will be conducted in the Engineering Development Laboratory (EDL, bldg. 786-A) to investigate the abrasive wear of paddles and the inlet auger of the Saltstone Scaled Mixer.