Wave Glider-Based Passive Acoustic Detection System CX(s) Applied: B3.6, B3.16, Date: 01/04/2012 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office
Nonproliferation Technology Section - Nanomaterials Research CX(s) Applied: B3.6 Date: 01/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Provision of Funds to the Colville Confederated Tribes for the Purchase of Two Parcels of Land Along the Okanogan River CX(s) Applied: B1.25 Date: 01/04/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Rensselaer Infrastructure Upgrade to Enhance Research and Education in Nuclear Engineering – Rensselaer Polytechnic Institute CX(s) Applied: B3.6 Date: 01/04/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Demonstration of Variable Speed Permanent Magnet Generator at Small, Low-Head Hydro Site CX(s) Applied: A9, B2.2, B5.15, B5.25 Date: 01/04/2012 Location(s): Kentucky Offices(s): Golden Field Office
City Hall Green Roof CX(s) Applied: B1.33, B5.1 Date: 12/29/2011 Location(s): California Offices(s): Golden Field Office
Gas Chromatography CX(s) Applied: B3.6 Date: 12/29/2011 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Erosion Control Project along Transmission Line 3016, Structure 31 CX(s) Applied: B1.33 Date: 12/29/2011 Location(s): Oklahoma Offices(s): Southwestern Power Administration
Paving the Way with Propane: The AutoGas Corridor Development Program CX(s) Applied: B5.1 Date: 12/29/2011 Location(s): Mississippi Offices(s): National Energy Technology Laboratory
Minnesota E85 Fueling Network Expansion Project CX(s) Applied: B5.22 Date: 12/29/2011 Location(s): Minnesota Offices(s): National Energy Technology Laboratory