Study of the Durability of Doped Lanthanum Manganite Cathode Materials under “Real World” Air Exposure CX(s) Applied: B3.6 Date: 09/05/2012 Location(s): New York Offices(s): National Energy Technology Laboratory
CH2MHill Plateau Remediation Company - Routine Maintenance and Custodial Services CX(s) Applied: B1.3 Date: 09/04/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Project L-718, Electrical Utilities Transformer Management Support Facility CX(s) Applied: B1.15 Date: 09/04/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Provision of Funds to the Washington Department of Fish and Wildlife (WDFW) CX(s) Applied: B1.25 Date: 09/04/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Provision of Funds to the Shoshone-Paiute Tribes of the Duck Valley Reservation (Shoshone-Paiute Tribes) to Purchase Five Parcels of Land in Owyhee County, Idaho CX(s) Applied: B1.25 Date: 09/04/2012 Location(s): Idaho Offices(s): Bonneville Power Adm...
California-City-Buena Park CX(s) Applied: A1, A9, B2.5, B5.1 Date: 09/04/2012 Location(s): California Offices(s): Energy Efficiency and Renewable Energy
Manufacturing of Protected Lithium Electrodes for Advanced Lithium Air, Water, and Batteries CX(s) Applied: A9, B3.6 Date: 09/04/2012 Location(s): California Offices(s): Golden Field Office
Alaska Wind Energy Project CX(s) Applied: A9, B1.19, B3.1 Date: 09/04/2012 Location(s): Alaska Offices(s): Golden Field Office
Advanced Computational and Modeling Research for the Electric Power System CX(s) Applied: A9 Date: 09/04/2012 Location(s): Tennessee Offices(s): National Energy Technology Laboratory
Beaver Creek- Big Sandy 115 Kilovolt Transmission Line Structure Replacements - Last Chance Fire CX(s) Applied: B4.13 Date: 08/31/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region