Categorical Exclusion (CX) Determinations By Date

Multiple Structure Replacement Flaming Gorge to Vernal No. 1 138 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region
Erosion Control Measures Structure No. 110-3 Dave Johnston to Stegall 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Erosion Control Measures Structure No. 20-1 East Morrill Tap to Lyman 34.5 Kilovolt Transmission Line, Scotts Bluff County, Nebraska CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountai...
New York State Alternative Fuel Vehicle and Infrastructure Deployment CX(s) Applied: B5.22 Date: 03/29/2012 Location(s): New York Offices(s): National Energy Technology Laboratory
Utility Pole Treatment within the Savannah River National Laboratory Technical Area CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
New York State Alternative Fuel Vehicle and Infrastructure Deployment CX(s) Applied: A1, B5.22 Date: 03/29/2012 Location(s): New York Offices(s): National Energy Technology Laboratory