Creation of Administrative Market Title CX(s) Applied: A1, A8, A9, A11 Date: 04/02/2012 Location(s): Massachusetts Offices(s): National Energy Technology Laboratory
A System Design Study for Wilmington Canyon Offshore Wind Farm CX(s) Applied: A9 Date: 04/02/2012 Location(s): Delaware Offices(s): Golden Field Office
Cheyenne Substation West Control Building Roof Replacement CX(s) Applied: B1.3 Date: 04/02/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Clinch River Environmental Studies Organization (CRESO) Partners Wetland Project CX(s) Applied: B3.3, B3.8 Date: 03/30/2012 Location(s): Tennessee Offices(s): Oak Ridge Office
Terry Ranch Road Substation CX(s) Applied: B1.24, B4.11 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Multiple Structure Replacement Flaming Gorge to Vernal No. 1 138 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region
Erosion Control Measures Structure No. 110-3 Dave Johnston to Stegall 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Erosion Control Measures Structure No. 20-1 East Morrill Tap to Lyman 34.5 Kilovolt Transmission Line, Scotts Bluff County, Nebraska CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountai...
Renewable Energy Ground Mounted Photovoltaic Grid System Overflow CX(s) Applied: B5.16 Date: 03/29/2012 Location(s): Other Location Offices(s): Golden Field Office
JDC Phosphate CX(s) Applied: A9, A11, B5.1 Date: 03/29/2012 Location(s): Florida Offices(s): National Energy Technology Laboratory