Power Line Configuration 2013-1 CX(s) Applied: B4.13 Date: 04/15/2012 Location(s): Idaho Offices(s): Nuclear Energy
Redmond-Pilot Butte Number 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 04/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Danger Tree Management on Shiprock-Four Corners 345 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 04/13/2012 Location(s): New Mexico Offices(s): Western Area Power Administration-Rocky Mountain Region
Routine Monitoring, Maintenance and Administrative at the Durango, Colorado Disposal and Former Processing Sites CX(s) Applied: B1.3, B3.1 Date: 04/13/2012 Location(s): Colorado Offices(s): Legacy Management
Routine Activities Associated with the Gasbuggy Site in Northern New Mexico CX(s) Applied: B1.3, B3.1 Date: 04/13/2012 Location(s): New Mexico Offices(s): Legacy Management
A 35 Ton Liquid Argon Prototype Detector Will Be Built in Building PC-4 as a Prototype Detector for the Long Baseline Neutrino Experiment CX(s) Applied: B3.6 Date: 04/12/2012 Location(s): Illinois Offices(s): Fermi Site Office
Californium Shuffler Removal Projects CX(s) Applied: B1.24, B1.31Date: 04/12/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Iowa City-Sioux City CX(s) Applied: A1, B1.32 Date: 04/12/2012 Location(s): Iowa Offices(s): Energy Efficiency and Renewable Energy
California City-Moreno Valley CX(s) Applied: A1, A9, A11, B2.5, B5.1 Date: 04/12/2012 Location(s): California Offices(s): Energy Efficiency and Renewable Energy
Installation of Stairs and Sampling Station for Storm Water Outfall G-10A CX(s) Applied: B3.1 Date: 04/12/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office