Geotechnical Core Drilling for USGS 138 CX(s) Applied: B3.1 Date: 04/18/2012 Location(s): Idaho Offices(s): Nuclear Energy
Renovation of E-Wing Ventilation, Building 773-A CX(s) Applied: B2.1 Date: 04/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Heating Actinide Materials in a 2.9 volume % Hydrogen Atmosphere Using a Laboratory Furnace in the C-155 Glovebox CX(s) Applied: B3.6 Date: 04/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Harnessing the Hydro-Electric Potential of Engineered Drops in the Columbia Basin Project: Phase 1 CX(s) Applied: A9 Date: 04/18/2012 Location(s): Washington Offices(s): Golden Field Office
Arizona State University - Cyanobacteria Designed for Solar-Powered Highly Efficient Production of Biofuels - Phase II CX(s) Applied: A9, B3.6 Date: 04/17/2012 Location(s): Arizona, Arizona, Arizona, Minnesota, North Carolina Offices(s): Advanced Rese...
Dismantling of 735-A and 735-11A Chillers and Condensers CX(s) Applied: B1.23 Date: 04/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace Big Hill Raw Water Intake System Oil Water Separator Tank with Concrete Tank CX(s) Applied: B1.3 Date: 04/16/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
West Hackberry Building 301 Air Handling Unit-1 Heating, Ventilation, and Air Conditioning Replacement CX(s) Applied: B1.4 Date: 04/16/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Prosser Hatchery Backup Generator Replacement CX(s) Applied: B1.31 Date: 04/16/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Routine Activities at Lakeview, Oregon, Processing and Disposal Sites CX(s) Applied: B1.3, B1.11, B3.1 Date: 04/16/2012 Location(s): Oregon Offices(s): Legacy Management