Munro Control Center Expansion CX(s) Applied: B1.15 Date: 06/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Upgrade Room Exhaust Flow Path of HB-Line Confinement Ventilation System CX(s) Applied: B2.2 Date: 06/21/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace 766-H Deteriorated Grease Trap CX(s) Applied: B1.3 Date: 06/21/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
SANfab: Module Manufacturing Facility CX(s) Applied: A9, B1.31, B5.1 Date: 06/21/2012 Location(s): California Offices(s): Golden Field Office
1366 Project Silicon: Reclaiming US Silicon Photovoltaic Leadership CX(s) Applied: A9, B1.31, B3.6, B5.1 Date: 06/21/2012 Location(s): Massachusetts Offices(s): Golden Field Office
Hurricane Natural Gas Fueling Station CX(s) Applied: B5.1, B5.22 Date: 06/21/2012 Location(s): Utah Offices(s): National Energy Technology Laboratory
The Shift for Good Community Program (Switch 4 Good) CX(s) Applied: A1, A8, A9, A11 Date: 06/21/2012 Location(s): Multiple Offices(s): National Energy Technology Laboratory
Smart Cementing Materials and Drilling Muds for Real Time Monitoring of Deepwater Wellbore Enhancement CX(s) Applied: B3.6 Date: 06/21/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Fiber Optic Installation at the Stegall 230 Kilovolt Substation Scotts Bluff County, Nebraska CX(s) Applied: B4.7 Date: 06/20/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region
Naval Reactors Facility Parking Lot Expansion General Plant Project CX(s) Applied: B1.15 Date: 06/20/2012 Location(s): Pennsylvania Offices(s): Naval Nuclear Propulsion Program, NRF