Gulf of Mexico Miocene Carbon Dioxide (CO2) Site Characterization Mega Transect CX(s) Applied: A9, A11 Date: 08/14/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Building 4 Lead Paint Abatement & Repainting CX(s) Applied: B2.1, B2.5 Date: 08/13/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Dayton Tap Line Retirement CX(s) Applied: B4.10 Date: 08/13/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Remove Existing Asphalt Islands and Re-stripe C-Road CX(s) Applied: B1.3 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks above Cubicles 139/144 in 705-K CX(s) Applied: B1.3 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Access Road Maintenance on the Chehalis-Centralia Number 1, Chehalis-Covington Number 1, Paul-Allston Number 2, and Paul-Napavine Number 1 Transmission Corridors CX(s) Applied: B1.3 Date: 09/13/2013 Location(s): Washington Offices(s): Bonneville Power...
Operation of Zeiss Sigma Variable Pressure Scanning Electron Microscope CX(s) Applied: B3.6 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Groundwater Characterization and Well Installation at the P-Area Reactor-Groundwater Operable Unit CX(s) Applied: B3.1 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Temporary Modification (ETP-TMC-13-01) to Install an Ultrasonic Sound-Emitting Device to Control Algae in the H-Retention Basin CX(s) Applied: B3.6 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Puget Sound Pilot Tidal Energy Project CX(s) Applied: A9 Date: 08/13/2013 Location(s): Washington Offices(s): Golden Field Office