Rev 1: Install new wire/tighten up pulley system for RiverSurveyor.…
Repair of the South and West sheetrock in room No. 2 and all sheetrock in room No. 3 in building No. 702-F. This includes: replacing cove base, pat…
Paint 802-50BC Steam Meter Cabinet near H Area.…
The Recipient is responsible for ensuring that all activities involving small unmanned aircraft systems (sUAS) are compliant with 14 CFR Part 107 o…
Remove ACM in steam room at 703-A. Remove ACM insulation from steam line and reinsulate with non-asbestos insulation.…
Replace a failing 42-inch corrugated metal pipe (CMP) located at the southeastern side of 730-4B building with a 42-inch class III reinforced concr…
Spent Material Clean-up within the 725-1N Abrasive Blasting Operations Area and Minor Maintenance of Silt Fence…
Roof replacement of multiple roofs on 105-K - Disassembly area, Personnel bldg., Purification areas, Stack area, 911 Fan Room, and Final Storage Ar…
OBU-H-2019-0454, Rev. 1: EEC revised to extend the project end date to 2026. The existing Seismic Detection Subsystem and a Tritium Confinement Sub…
Bonneville Power Administration (BPA) proposes to replace insulators, remedy impairments and improve access roads in multiple locations along the C…