This Amended Determination follows the approval of additional funds and period of performance to develop a field-tested flare and control system to…
This Amended Determination follows the approval of additional funds and extended period of performance to support the project team's small-scale re…
Versant Power (the Applicant), formerly known as Emera Maine, has applied for renewed authorization to transmit electric energy from the United Sta…
The 34.5kV line will be rebuilt from the Attica interconnection meter to the substation which will include new oles, conductors, insulators, transf…
Replacement of reactors in the Ahsahka substation. Improve wildfire mitigation through aerial inspection of overhead power lines, and software upgr…
Installation of smart meters on all 3210 meters in the system to allow for real-time data infrastructure to monitor and control outages and assist …
Replacement of select electrical infrastructure at TS4 and TS9.…
This project will design an optimized electrochemical system in anticipation of phase 2 field trials in which sodium hydroxide (NaOH) will be elect…
The project is aimed at revolutionizing vulnerability detection, classification, and exploitability determination techniques within control system …
Administrative and project management activities, computer modeling and analysis, field deployment of methane monitoring sensors (ground, vehicle, …