Argonne ESPC IV Combined Heat and Power Plant CX(s) Applied: B5.14 Date: 07/02/2013 Location(s): Illinois Offices(s): Argonne Site Office
200 Area Chilled Water System Expansion CX(s) Applied: B1.15 Date: 07/02/2013 Location(s): Illinois Offices(s): Argonne Site Office
Thermal Diffusivity Evaluation CX(s) Applied: B3.6 Date: 07/02/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Herbicide Application at Four Substations: Blythe, Knob, Parker, and Senator Wash Located in California during Fiscal Year 2014 CX(s) Applied: B1.3 Date: 07/01/2013 Location(s): California, California, California Offices(s): Western Area Power Adminis...
Herbicide Application at 40 Substations Located in Arizona During Fiscal Year 2014 CX(s) Applied: B1.3 Date: 07/01/2013 Location(s): Arizona, Arizona, Arizona, Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Geologic Characterization of the South Georgia Rift Basin (Task 8.2) CX(s) Applied: A9 Date: 07/01/2013 Location(s): South Carolina Offices(s): National Energy Technology Laboratory
Geologic Characterization of the South Georgia Rift Basin (Task 8.2) CX(s) Applied: A9, B3.1 Date: 07/01/2013 Location(s): Georgia Offices(s): National Energy Technology Laboratory
Kalispell Shunt Cap Addition Project CX(s) Applied: B4.11 Date: 07/01/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Nine Canyon Communication Tower Addition CX(s) Applied: B4.6 Date: 07/01/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Supporting a Clean Energy Economy CX(s) Applied: A9, A11 Date: 07/01/2013 Location(s): CX: none Offices(s): Golden Field Office