Predicting Microstructure-Creep Resistance Correlation in High Temperature Alloys over Multiple Time Scales CX(s) Applied: B3.6 Date: 07/03/2013 Location(s): Indiana Offices(s): National Energy Technology Laboratory
Mariah Wind CX(s) Applied: B1.7 Date: 07/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Umatilla Electric Cooperative CX(s) Applied: B4.9 Date: 07/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Teakean Butte Radio Station Upgrade CX(s) Applied: B1.19, B1.24 Date: 07/03/2013 Location(s): Idaho Offices(s): Bonneville Power Administration
Alaska Wind Energy Research Project (formally "St. Paul Wind Technology Development Project, Phase 2") CX(s) Applied: A9, B2.2, B3.1 Date: 07/03/2013 Location(s): Alaska Offices(s): Golden Field Office
Extraction of Uranium Compounds from Environmental Samples CX(s) Applied: B3.6 Date: 07/03/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Radionuclide Release from Tank Waste Residual Solids CX(s) Applied: B3.6 Date: 07/03/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace West Hackberry Brine Disposal System Header from MOV-51’s to WHT-14/15 Brine Tanks with HDPE Pipe CX(s) Applied: B5.2 Date: 07/03/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Bryan Mound Brine Disposal Pump Replacement CX(s) Applied: B5.2 Date: 07/03/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Outdoor, Small-and Pilot-Scale Research and Development CX(s) Applied: A9, B1.24, B3.4, B3.6, B3.8, B3.10, B3.12, B3.13, B3.15 Date: 07/03/2013 Location(s): Tennessee Offices(s): Oak Ridge Office