Electrical District 2 to Saguaro #2 115 Kilovolt Transmission Line, Marker Ball Installation at Structure 26-10. CX(s) Applied: B1.3 Date: 01/09/2014 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
North Central Texas Alternative Fuel and Advanced Technology Investments CX(s) Applied: B5.23 Date: 01/08/2014 Location(s): Texas Offices(s): National Energy Technology Laboratory
Midwest Region Alternative Fuels Project CX(s) Applied: A1 Date: 01/08/2014 Location(s): Missouri Offices(s): National Energy Technology Laboratory
Solar, Install, Mount, Production, Labor, Equipment (SIMPLE BoS) CX(s) Applied: A9, B3.6, B5.16 Date: 01/08/2014 Location(s): Georgia Offices(s): Golden Field Office
Dynamic Mechanical Analyzer CX(s) Applied: B3.6 Date: 01/06/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Longview-Cowlitz Fiber Optic Cable Upgrade CX(s) Applied: B4.7 Date: 01/06/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Miller Number Abrasivity Tester CX(s) Applied: B3.6 Date: 01/06/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Blue River-Gore Pass 230 Kilovolt Transmission Line Danger Tree Management in Grand County, Colorado CX(s) Applied: B1.3 Date: 01/06/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Subcontractor Repair of Roof Leaks at 704-23G CX(s) Applied: B1.3 Date: 01/06/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office
Characterization and Analyses of Core Samples from the 105-C Disassembly Basin CX(s) Applied: B3.6 Date: 01/06/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office