Timber Tap to Keeler-Tillamook Temporary Bridge and Access Road Maintenance CX(s) Applied: B1.3Date: 09/21/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Categorical Exclusion Determination
High Inlet Temperature Combustor for Direct Fired Supercritical Oxy-Combustion - Phase II CX(s) Applied: B3.6Date: 09/21/2016 Location(s): TexasOffices(s): National Energy Technology Laboratory
Sensor Enabled Coatings for Methane Release Mitigation CX(s) Applied: A9, B1.7, B3.6Date: 09/21/2016 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Development of Enabling Technologies for a Pressurized Dry Feed Oxy-Coal Reactor CX(s) Applied: A11, B3.6Date: 09/21/2016 Location(s): UtahOffices(s): National Energy Technology Laboratory
B-58 Roof and RTU Replacement CX(s) Applied: B1.3Date: 09/21/2016 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Experimental and Modeling Investigation of Overcooling Transients that include Freezing, in Fluoride-Salt Cooled High-Temperature Reactors - University of Wisconsin CX(s) Applied: B3.6Date: 09/21/2016 Location(s): IdahoOffices(s): Nuclear Energy
Advanced Electrochemical Separations of Actinide/Fission Products via the Control of Nucleation and Growth of Electrodeposits- University of Idaho CX(s) Applied: B3.6Date: 09/21/2016 Location(s): IdahoOffices(s): Nuclear Energy
Kalispell & Spokane Districts Road Maintenance Project CX(s) Applied: B1.3Date: 09/20/2016 Location(s): Multiple LocationsOffices(s): Bonneville Power Administration
Categorical Exclusion Determination