Next Generation MHK River Power System Optimized for Performance, Durability and Survivability Award Number: DE-EE0007348 CX(s) Applied: A9 Water Power Program br> Date: 03/14/2016 Location(s): AK Office(s): Golden Field Office
Equipment Additions to Multiple Substations and Radio Facilities CX(s) Applied: B1.7Date: 03/14/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Small Modular Reactor Site Inspection Visit CX(s) Applied: B3.1Date: 42443 Location(s): IdahoOffices(s): Nuclear Energy
Curecanti Lost Canyon 230 Kilovolt Transmission Line Vegetation Management on Structures 58/4 to 73/4 and 88/3 to 92/2 Dolores, Montezuma and San Miguel Counties CX(s) Applied: B1.3Date: 3/11/10216 Location(s): ColoradoOffices(s): Western Area Power Ad...
Subsea Produced Water Sensor Development (Project Modifications) CX(s) Applied: A9, A11, B3.6Date: 03/11/2016 Location(s): TexasOffices(s): National Energy Technology Laboratory
Trident: A Human Factors Decision Aid Integrating Deepwater Drilling Tasks, Inc. CX(s) Applied: A9Date: 03/11/2016 Location(s): TexasOffices(s): National Energy Technology Laboratory
Trident: A Human Factors Decision Aid Integrating Deepwater Drilling Tasks, Incidents, and Literature CX(s) Applied: A9Date: 03/11/2016 Location(s): Multiple LocationsOffices(s): National Energy Technology Laboratory
Subsea Produced Water Sensor Development (Project Modifications) CX(s) Applied: A9, A11, B3.6Date: 03/11/2016 Location(s): TexasOffices(s): National Energy Technology Laboratory
Subsea Produced Water Sensor Development (Addition of Sub-Recipient) CX(s) Applied: A9, A11, B3.6Date: 03/11/2016 Location(s): OtherOffices(s): National Energy Technology Laboratory
Enabling Sustainable Landscape Design for Continual Improvement of Operating Bioenergy Supply Systems Award Number: DE-EE0007088 CX(s) Applied: A9, B3.1, B3.16, B5.15 Bioenergy Technologies Office Date: 03/08/2016 Location(s): MD Office(s): G...