Remove/Replace Floor Tile at 702-K & 702-L CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-L CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
New Heating, Ventilation, and Air-Conditioning System for L-Area Complex CX(s) Applied: B2.1Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 713-1N CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-1N CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Remove Inductively Coupled Plasma Mass Spectrometer from B147/151 CX(s) Applied: B1.31Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Roof Repairs at 773-A CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Speciation of Mercury in Sludge Solids CX(s) Applied: B3.6Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Research and Education Campus (REC) Fiscal Year (FY) 2016 Through FY2017 Interior Updates CX(s) Applied: B1.15Date: 08/12/2016 Location(s): IdahoOffices(s): Nuclear Energy
North Bonneville-Troutdale No. 1 Transmission Line Gate Replacement CX(s) Applied: B1.3Date: 08/11/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration