CX-270255: Research and Education Campus (REC) Fiscal Year (FY) 2016 Through FY2017 Interior Updates
Categorical Exclusion Determination
Development of the CSX Centrifugal Contractor System for Large-scale Solvent Extraction Applications in the Mining and Metals Industry CX(s) Applied: B3.6Date: 08/24/2016 Location(s): IllinoisOffices(s): Argonne Site Office
Automatic ultrasonic testing (AUT) Survey for 48 inch Big Hill (BH) Brine Disposal Pipeline CX(s) Applied: B1.3Date: 08/24/2016 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Bryan Mound-Seaway Pipeline Inspection and Repair CX(s) Applied: B1.3Date: 08/24/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
ISU AGN-201 Reactor Safety Channels Upgrade- Idaho State University CX(s) Applied: B2.5Date: 08/24/2016 Location(s): IdahoOffices(s): Nuclear Energy
In Situ Raman Spectroscopy for Determining Actinide Speciation and Concentration - Rensselaer Polytechnic Institute CX(s) Applied: B3.6Date: 08/24/2016 Location(s): IdahoOffices(s): Nuclear Energy
Brasada-Harney, Redmond-Brasada No. 1 Transmission Lines 2016 Wood Pole Replacements CX(s) Applied: B1.3Date: 08/23/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Lane Substation Fiber Separation CX(s) Applied: B4.7Date: 08/23/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Categorical Exclusion Determination