The DCF will update a TCVG indicator from an obsolete model number to a new model supported by the vendor (Teledyne Hastings Instruments). The pre…
Removal of suspect asbestos gaskets from valves in Building 703-A to facilate replacement of relief valves, steam traps, and/or other valves associ…
Remove and replace carpet in rooms 569, 570, 567, 566, 565, 564, 563, 562, 598, 597, 596, & 572. Rooms 596, 597, & 598 will have asbestos tile to …
Improve work conditions inside 511-S for outage and project construction activities supporting the Salt Waste Processing Facility tie-ins by instal…
Paint the wall as you turn right off the elevator on the 2nd floor from corner to corner. The paint should match the color that is currently on the…
Trailers are to be moved to support Saltstone Disposal Unit 7 construction.…
Remove, replace, reinstall HPC-TRP-002 (steam trap) associated piping, insulation (non-asbestos). There is an associated presumed asbestos contain…
Paint walls/door, replace floor tile, and ceiling tiles in Building 704-K Room 161 and prep/paint 704-K lunch room walls, doors, and replace ceilin…
As part of the C-Area Ground Water (CAGW) Removal Action and to reduce the risk of injury, Area Completion Projects will install handrails at the C…
Corrosion testing per ASTM standards on stainless steels and corrosion-resistant alloys for intergranular corrosion susceptibility performed on met…