On Saturday, May 4, 2019, the fire water line west of 221-H South Dock failed. A sink hole was created by the water flow which caused a bollard to…
The DE vessel installed in Room 17 Diffuser System had two of four heater elements fail. In efforts to continue production, the remaining two heate…
Bonneville Power Administration (BPA) is proposing to allow Tualatin Soil and Water Conservation District (Tualatin SWCD) to survey for and treat –…
The Bonneville Power Administration (BPA) is proposing to perform urgent work on the Sammamish-Maple Valley #1 230kV transmission line between stru…
Remove two presumed asbestos containing material (PACM) gaskets from Totalizer at Recovery Well 2 to allow for routine maintenance.…
Remove presumed asbestos containing material (PACM) gaskets from flanges and conduct maintenance on #2 Service Water Pump.…
Kairos Power, LLC, in collaboration with Brigham Young University (BYU), proposes to develop and document the methodological approach for establish…
Award Number: DE-EE0008747, CX(s) Applied: A9, B3.6, B3.15, Solar Energy Technologies Office, Location(s): WA, Office(s): Golden Field Office
Machine learning/AI development using Synchrophasor data.…
Funding will support the project team's small-scale research and development activities to develop proton exchange membrane (PEM) fuel cells that…