Replace Valve F1-905102-WW-V-016 at 905-102F Process Deepwell.…
This EEC addresses the siting and installation of utilities (under ground electrical supply) of the new Storm Shelter 704-39G located at Burma Road…
Transition the existing Siemens PLC and touchscreen to an Emerson DeltaV controller and touchscreen operator workstation in cabinet H-234000-METL-C…
The K-Area Interim Surveillance (KIS) FM-200 fire suppression system will need to be redesigned to replace the soon to be discontinued Chemetron Fi…
Correct leak and replace valve SW-V-001(10") at 681-3G Pump House #3.…
This activity involves installing a MicroBlower™ at existing well MRS-34. Furthermore, three existing vadose zone wells (i.e., MVE-13, MVE-17, and…
Bonneville Power Administration (Bonneville) is currently proposing to enter into an EIM implementation agreement with CAISO which would obligate B…
The Recipient will develop methods to fabricate and test ceramic anchors with an embedded sensor technology for monitoring the health and processin…
Project Management; bench-scale testing activities; techno-economic studies; marketing analysis; data analysis; coal sample shipping; design/machin…