Installation of new domestic water piping in J and S-Areas.…
The nature of this modification is to blow out the CW coils in the 234-4H Air Handling Unit (AHU) with air. To do this, each individual coil must b…
This activity is for completing deactivation of the 236-H By-Product Facility. This facility includes the retired Burst Test Process, the He-3 Puri…
Insulation and mastic to be removed from chilled water piping feeding AHU-002 at 702-2A. Section to be removed to allow access to a y-strainer for …
The proposed action plans, prepares, coordinates, ships materials off-site, observes, and completes radiological response training at Idaho Nationa…
The Department of Energy intends to fund operation and maintenance actions at the Sanford Underground Research Facility (SURF). Actions would be bo…
The objective of Phase II is to build on the pre-FEED work completed in Phase I and be prepared to begin a detailed engineering design and construc…
USGS will measure surface water methane and CO2 concentrations and other parameters required to calculate the sea-air exchange of these greenhouse …
RTI proposes to design and engineer novel surface treatments and secondarily applied remediation components to mitigate biofilm growth on condenser…
Laboratory-based examinations of rich gas interactions with reservoir fluids and tight rocks