The purpose of this Environmental Checklist (EC) is to address activities at any Idaho National Laboratory (INL) facility, building or structure, e…
The purpose of this Environmental Checklist (EC) is to address activities at any INL facility, building or structure, either in-town or at the INL …
The purpose of this revision is to capture additional work activities (soil sampling and asbestos disturbance) and environmental aspects. A discuss…
The Western Area Power Administration (WAPA) is proposing to reduce incompatible vegetation and fuel loading within the Right-of-Way (ROW) along th…
The Life Safety System (LSS) for the Specific Manufacturing Capability (SMC) and Test Area North (TAN) is over 20 years old, and replacement parts …
The existing fence line at Kalispell Substation is incomplete. The main gate is missing, so the public can walk up or drive up to the control house…
AT&T proposes to upgrade their wireless communications infrastructure that is currently located on BPA’s existing Mt. Blyn communications tower. …
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, g…
This proposed activity will renovate men's and women's bathrooms on the fourth level of H Canyon.…
Sampling crew will Collect 1” x 18” sediment cores and surface water samples from the Steeds Pond Soil Contamination Area.…