The roof at EBR-1 sections 2, 3, 4 and the guard house (figure 1) have reached the end of their useful life. Preventative maintenance is required t…
Award Number: DE-EE0007823, CX(s) Applied: A9, B3.16, Water Power Technologies Office, Location(s): WA, Office(s): Golden Field Office
Award Number: DE-EE0009026, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): AR, Office(s): Golden Field Office
CX-101711: Automating Detection and Diagnosis of Faults, Failures, and Underperformance in PV Plants
Award Number: DE-EE0008976, CX(s) Applied: A9, B3.1, Solar Energy Technologies Office, Location(s): NC, Office(s): Golden Field Office
Award Number: DE-EE0009022, CX(s) Applied: A9, B5.15, Solar Energy Technologies Office, Location(s): NV, Office(s): Golden Field Office
Tritium Extraction Facility (TEF) Open Glovebox Maintenance on GB 3000 to rebuild GB recirculation blowers.…
Road 4 (2.8 miles) will be milled 2-1/2 inches, paved with 1 inch Open Graded Interlayer (OGI) and 2 inches of asphalt, striped with thermoplastic …
Road E (2.5 miles) will be milled 2-1/2 inches, paved with 1 inch Open Graded Interlayer (OGI) and 2 inches of asphalt, striped with thermoplastic …
Bonneville Power Administration (BPA) proposes to remove a 7-foot-tall chain-link fence surrounding the Bell Substation and Maintenance Headquarter…
This research proposes to apply a state-of-the-art deep learning based and edge-centric data analytics system to significantly reduce the size of D…