Tritium Extraction Facility (TEF) Open Glovebox Maintenance on GB 3000 to rebuild GB recirculation blowers.…
Road 4 (2.8 miles) will be milled 2-1/2 inches, paved with 1 inch Open Graded Interlayer (OGI) and 2 inches of asphalt, striped with thermoplastic …
Road E (2.5 miles) will be milled 2-1/2 inches, paved with 1 inch Open Graded Interlayer (OGI) and 2 inches of asphalt, striped with thermoplastic …
Bonneville Power Administration (BPA) proposes to remove a 7-foot-tall chain-link fence surrounding the Bell Substation and Maintenance Headquarter…
This research proposes to apply a state-of-the-art deep learning based and edge-centric data analytics system to significantly reduce the size of D…
This project is planned to focus on addressing two of the knowledge gaps in severe accident analysis and management identified in the aftermath of …
CX(s) Applied: Multiple, Weatherization Assistance Program, Location(s): Multiple, Office(s): Golden Field Office
Award Number: DE-AC36-08GO28308, CX(s) Applied: B3.6, NREL, Location(s): CO, Office(s): Golden Field Office
Award Number: DE-EE0008904, CX(s) Applied: A9, B3.6, B5.15, Bioenergy Technologies Office, Location(s): CO, Office(s): Golden Field Office
The contractor shall assist FFPO Cyber Security Engineers with installation of Splunk Security Software Cloud Subscriptions in New Orleans.…