The subcontractor shall replace wooden line switch ties from the railroad bed, identified by site transportation and engineering as part of the 202…
Perform structural repairs on 772-F and 772-1F per the structural integrity program, SIP, inspection report T-CLC-F-00557.…
Install Universal Wiring, UW, drops in Building 730-2B.…
This proposed activity will install a spill containment box and vapor stimulator tubes at 254-5H Fuel Oil Underground Storage Tanks, FOUSTs, to all…
This ongoing activity includes the operation of several gas chromatographs and a liquid chromatograph and mass spectrometer in 735-A, 735-11A and 7…
Subcontractor will provide roof repairs at 713-3N.…
To provide building transition section, plenum, details for portable HVAC unit for 105-13K building.…
The 233-24H warehouse building heat pump is being replaced and utilizes slightly different controls.…
Renovate the 264-1H Rm 151 kitchen with new flooring, paint, countertops, and cabinets.…
LED upgrade of exterior lighting of building 247-H…