Remove and replace floor tiles in select portions of the Purification Area within the K-Reactor, and prep and paint select wall locations.…
Remove both Uninterruptible Power Supply, UPS, systems in Building 234-H, Room 340 to provide addtional work space in the area.…
Under project Y757, the E3S system was replaced with the Argus Security System in 234-H.…
The 701-3H Entry Control Facility into the Tritium Limited Area, LA, is currently an unoccupied space.…
Make repairs to floor of 704-37E and 704-29E.…
Install hands free water dispensers in 704-C, 703-43A, 704-N, and 703-46A.…
Install additional receptacles in Building 736-A, Room 131.…
Repair and Replace Packing of 1 Steam Valve Outside of K-Area Purification and 2 Steam Valve Inside of Purification…
SRNL Research and Development Engineering will be conducting a fire suppression test in 723-A to support the Surplus Pu Disposition Project in K-Ar…
Venting or direct-shipment and disposal of specialty gas cylinders, nitrogen, carbon dioxide, compressed air, in A Area.…