Award Number: DE-EE0009243, CX(s) Applied: A9, B3.6, B3.15, Fuel Cell Technologies Office, Location(s): AZ, Office(s): Golden Field Office
This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is NOT required.…
A portable building will be installed in 737-A SREL Complex for research purposes.…
Install a new 3-Ton HVAC unit to provide conditioned air to the Water Jet Area to prevent costly maintenance to the Water Jet computer.…
Housekeeping the 105-C Stack Area.…
Replace Building 751-1A Fire Alarm System.…
This EEC covers all maintenance activities performed by SRNS organizations that have the potential to disturb gasket and gasket-like materials (i.e…
This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is required.…
The Krieger project is a proposed advanced technology test of radiological/nuclear detection equipment (gamma and neutron detection).…
This EEC includes all cell, molecular, and microbial biological research performed within the BSL2 laboratory located in 999-1W ACTL facility, in l…