709-1G, Replace damaged tile and wallboard in ladies shower.…
The proposed action would include general PNNL business activities, award of contracts, a variety of information gathering techniques including lit…
Remove and repoint deteriorated mortar joints as necessary. Cut-out and caulk cracks in masonry with a high strength/low modulus epoxy. Patch exist…
The Geomechanics and Flow Lab will combine three previously permitted NETL labs: GGSCFL, Degradation of Wellbore Cements Due to CO2 Injection, and …
BPA proposes to fund the Colville Confederated Tribe (CCT) to construct instream structures [Beaver Dam Analogs and Post Assisted Log Structures] a…
In the Application, as relevant here, DECP asks DOE/FE to extend its 20-year export term in Order No. 3331-A to a term ending on December 31, 2050.
In the Application, as relevant here, Calcasieu Pass asks DOE/FE to extend its 20-year export term in Order No. 4346 to a term ending on December 2050
In the Application, as relevant here, Rio Grande LNG asks DOE/FE to extend its 20-year export term in Order No. 4492 to a term ending on December 2050
In the Application, as relevant here, Plaquemines LNG asks DOE/FE to extend its 20-year export term in Order No. 4446 to a term ending on December 31,
LM is proposing a 1-day visit to the Chariot, Alaska, Site to install four institutional control (IC) markers.…