This scope of work covers activities associated with the development of electrolytic cell and catalyst reactor components for projects such as sulf…
730-4B Touch up paint and replace cove base for Rooms 135A, 135B, and 134.…
703-43A Remove/replace carpet.…
MOX-Termination has determined that portable building 149 is now excess.…
Award Number: DE-EE0008568, CX(s) Applied: A9, A11, Solar Energy Technologies Office, Location(s): CO, Office(s): Golden Field Office
Award Number: DE-EE0009254, CX(s) Applied: A9, B3.1, Geothermal Technologies Office, Location(s): NV, Office(s): Golden Field Office
BPA proposes to increase loading by up to 35 megawatts (MW) through an existing interconnection at BPA’s Bellingham Substation in Bellingham, What…
The Biomass Feedstock National User Facility (BFNUF) offers technology and expertise to help the U.S. bioenergy industry overcome challenges during…
The Kesselring Site Head Tanks Corrosion Protection Project includes work to Head Tanks (27A and 27B) for repairs to the interior iron oxide uretha…
Feasibility study that includes techno-economic and digital twin modeling of sulfur thermal energy storage (TES) integrated with fossil fueled elec…