In the Application, as relevant here, Delfin asks DOE/FE to extend its 20-year export term in Order No. 4028 to a term ending on December 31, 2050.…
In the Application, Driftwood asks DOE/FE to extend its 20-year export term in Order No. 4373 to a term ending on December 31, 2050.…
Perform a conceptual level design study of an innovative hydrogen energy storage system, the synergistically integrated hydrogen energy storage sys…
BPA proposes to fund the Confederated Tribes of the Warm Springs Reservation of Oregon to implement the Dead Cow Wood Placement project. …
Replace existing substation perimeter fence at Sikeston Substation.…
EPRI will support fabrication of the primary heater, turbine stop valve, and system elements and assess impacts of oxidation, corrosion, leakage, f…
Argonne's scientific advancements require a strong foundation that supports reliable, redundant, maintainable, and flexible utility systems, as thi…
Subcontractor will provide roof replacement at 735-A.…
Subcontractor will provide roof repairs at 723-15A.…
Subcontractor to perform roof repairs for Building 794-A.…