Housekeeping effort to remove excess piping and instrumentation that is no longer utilized near 285-H.…
Piping in the Special Container Loading and Unloading (SCLU) system will be replaced with like-for-like piping due to the potential for mercury con…
The current method of filling the basin is an altitude valve designed to make up for large drops in basin level and not for routine smaller changes…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform modifications to existing pump and piping configurations (including, …
An effort is being made to remove all nuclear safety blanks (NSBs) in H Canyon and installing blind flanges to create an air gap. An air gap provid…
An effort is being made to remove all nuclear safety blanks (NSBs) in H Canyon and installing blind flanges to create an air gap. An air gap provid…
An effort is being made to remove all nuclear safety blanks (NSBs) in H Canyon and installing blind flanges to create an air gap. An air gap provid…
The proposed actions comprise maintenance support services frequently and routinely requested for operational support of DOE facilities and propert…
905-119H Flush Line needs a hard pipe discharge connection to the basin to mitigate a safety hazard. A flow meter will also be installed to provide…
The above ground make-up water piping behind the 285-H basin is out of service and creates an unnecessary trip hazard and leak point. This design d…