905-119H Flush Line needs a hard pipe discharge connection to the basin to mitigate a safety hazard. A flow meter will also be installed to provide…
The above ground make-up water piping behind the 285-H basin is out of service and creates an unnecessary trip hazard and leak point. This design d…
The DOE Loan Programs Office (LPO) is considering whether to issue a loan guarantee of a funding facility to DTE Gas Company (DTE) pursuant to its authority under the EIR 1706 Program.
CX-033482: Kansas City National Security Campus (KCNSC), KCNSC25-03, MoC 4017, Main Campus Tank Farm
Add new (3rd) liquid nitrogen (LN2) tank to the gaseous nitrogen (GN2) system. …
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the San Rafael Special Services District for re…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform modifications to existing pump and piping configurations (including, …
Reroute Domestic Water Piping to Hydro Test Station in 717-F.…
The Department of Energy intends to fund operation and maintenance actions at the Sanford Underground Research Facility (SURF).…
Install Domestic Water flow meters at 730-2B and 730-4B.…
The Utility Infrastructure Project (UIP) includes improvements to sitewide utilities to support Fermilab's mission over the next 40 years.…