The Kesselring Site Reverse Osmosis System Overhaul Project will replace the current Reverse Osmosis (RO) system located inside the KS Boiler House with a new water purification system.
Fire Alarm and ENS Control Panel Replacement (Pittsburgh, PA), Fire Alarm and ENS System Upgrade (Albany, OR), Utility Meter Installation (Albany, …
Feasibility and FEED study to scale up processes for converting natural and recycled synthetic graphite ton-scale pilot plant which will culminate …
The overall objective of this research and development (R and D) project is to establish a semi-continuous process for conversion of cerium oxide, …
Removal of equipment originally used by MOX from Building 221-21F to Excess/Salvage - Salvage Yard Transfer Building 741-1N. Preparation includes, …
CX-035390: Replacement of Scanning Electron Microscope (SEM) in Inert Metallography Laboratory (IML)
The JEOL JSM-6460LV Scanning Electron Microscope (SEM), along with all peripheral attachments, are to be removed and replaced with a new SEM. The n…
The purpose of the action is to apply Categorical Exclusion (CX) B1.31 "Installation or Relocation of Machinery and Equipment," as a Generic CX wit…
This scope of work was previously evaluated under EEC OBU-H-2019-0019. Since a revision was required and the EEC database no longer uses the previo…
HVAC units in buildings 781-A and 749-A will be replaced due to age and degradation. Replacement D and R and installation activities will be comple…
Additional modifications at 501-A. Revision 1 necessary to extend the end date and added work scope: Replace 501-A Diesel Generator and Associated …