Bonneville Power Administration (BPA) prepared this Draft Environmental Assessment (EA) (DOE/EA-2287) for the Big Eddy-Ostrander Conductor Replacement Project. The public comment period closes April 26, 2025.
Office of NEPA Policy and Compliance
March 27, 2025Big Eddy-Ostrander Conductor Replacement Project; Multiple Locations, Oregon
Bonneville Power Administration (BPA) prepared a Draft Environmental Assessment (EA) (DOE/EA-2287) for the Big Eddy-Ostrander Conductor Replacement Project.
For more information, see Big Eddy-Ostrander Conductor Replacement Project.