CX-005730: Categorical Exclusion Determination

State Energy Program Sinton Independent School District Wind Energy Project- Phase IICX(s) Applied: B5.1Date: 04/21/2011Location(s): San Patricio County, TexasOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

Office of NEPA Policy and Compliance

April 21, 2011
Estimated Read Time   min
State Energy Program Sinton Independent School District Wind Energy Project- Phase II
CX(s) Applied: B5.1
Date: 04/21/2011
Location(s): San Patricio County, Texas
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

The Sinton Independent School District (ISO), San Patricio County, Texas proposes to install a 100 kilowatt wind turbine (Northern Power 100) on the campus of their high school to reduce operations costs, increase energy efficiency, reduce reliance on imported energy, improve reliability, and reduce environmental impacts of energy production. The turbine would be installed on a 121-foot tall tubular steel tower, have a rotor diameter of 69 feet, and a total height of about 156 feet.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD