Metro Nashville and Davidson County are proposing to use Energy Efficiency and Conservation Block Grant (EECBG) American Recovery and Reinvestment Act funding to install a ground source heat pump system that will serve the heating and cooling needs for the existing Nashville Bridge Company Building (NABRICO) building on the Cumberland Riverfront. The ground source heat pump system will be a vertical, closed loop system with a capacity of 65 tons. There will be 24 boreholes needed covering 9,600 square feet.