
What’s the safest way to climb and inspect a 70-year-old, 250-foot-tall brick exhaust stack?

After years of planning, the future interim storage area for nearly 2,000 highly radioactive capsules is taking shape at the Hanford Site.
EM contractors across the complex have been honored with a variety of awards for safety and health excellence in DOE’s Voluntary Protection Program.

EM’s cleanup at Oak Ridge is supported by numerous vehicles that ship waste, transport personnel, and deliver items.

UCOR are conducting a critical review of remediation measures in place across the Oak Ridge Reservation virtually.

EM and cleanup contractor CH2M HILL BWXT West Valley (CHBWV) recently began grouting a large underground cell at the West Valley Demonstration Project

The Savannah River Site (SRS) has launched innovative methods to ensure emergency preparedness drills continue in light of the COVID-19 pandemic.

From a more efficient approach for disposing debris to a digital-based monitoring system that helps detect and prevent heat stress.

the Savannah River Site (SRS) have developed a system that improves protection for workers who handle and dispose of contaminated laboratory waste.
EM's West Valley Demonstration Project (WVDP) recently encapsulated a concrete foundation slab left following the demolition of a utility building.