Evaluation of two incidents involving inadequate implementation of nuclear criticality safety program elements at Los Alamos National Laboratory.
Related to industrial hygiene program requirements at the Waste Isolation Pilot Plant.
Federal Operational Readiness Review Assessment at the Savannah River Site Salt Waste Processing Facility
Safety Basis Assessment at the Savannah River Tritium Facility
Related to nuclear criticality control weaknesses at Y-12 National Security Complex.
Related to several electrical relay failures and fire response events at Idaho National Laboratory’s Advanced Test Reactor.
Related to a near miss involving a backhoe tip over event at the Waste Isolation Pilot Plant.
Related to an electrical shock from an energized insulation retaining wire at the National Renewable Energy Laboratory.
Assessment of Radioactive Waste Management at the Savannah River Site Interim Report – December 2019
Assessment of Radioactive Waste Management at the Savannah River Site Interim Report
Assessment to Evaluate the Implementation of the Fire Protection Program the Savannah River Salt Waste Processing Facility