More Resources
-
PageOctober 22, 2026The DOE Office of Legacy Management took responsibility for the Utah site in 2019. The U.S. Atomic Energy Commission conducted site activities under the Plowshare Program during the late 1960s and early 1970s.Office of Legacy Management
-
October 22, 2026Office of Environment, Health, Safety & Security
-
October 22, 2026The DOE Office of Legacy Management took responsibility for the Pre-Schooner II site in 2019. The U.S. Atomic Energy Commission conducted site activities under the Plowshare Program during the 1960s.Office of Legacy Management
-
October 22, 2026The purpose of this section is to describe the Cable and Conduit Raceway Review which should be used to screen out from further consideration the cable and conduit raceways which can be shown to be seismically adequate. The Cable and Conduit Raceway Review consists of: (1) a facility walkdown in which the raceways are evaluated against a set of Walkdown Guidelines, and (2) an analytical check of selected worst-case supports using a set of Limited Analytical Review Guidelines.Office of Environment, Health, Safety & Security
-
October 22, 2026Office of Environment, Health, Safety & Security
-
October 22, 2026This section describes the guidelines which should be used for evaluating the seismic adequacy of those horizontal tanks and heat exchangers which are listed in the SEL as identified in Chapter 4. these guidelines are intended only for use on existing horizontal tanks and heat exchangers and are not to be used for new installations. lOffice of Environment, Health, Safety & Security
-
October 22, 2026Hydrocarbons and Geothermal Energy Office
-
October 22, 2026Hydrocarbons and Geothermal Energy Office
-
October 22, 2026Hydrocarbons and Geothermal Energy Office