More Resources
-
November 17, 2025Install the ADA technology at the Orsted Ford Ridge wind farm. The system will be designed to integrate with the plant's SCADA operational (OT) net…Office of NEPA Policy and Compliance
-
November 17, 2025BEA is performing additional Senior Seismic Hazard Analysis Committee (SSHAC) Level 1 and/or 2 on behalf of the U.S. Department of Energy (DOE). Th…Office of NEPA Policy and Compliance
-
November 17, 2025The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the City of Racine (City), WI to develop, design, and install a solar photovoltaic (PV) carport system at the City's Bus Garage, incorporate energy efficiency upgrades, including advanced building control systems and installing light emitting diodes (LED) at multiple locations, and install energy conservation measures (EBCx), conduct existing building commissioning, and implement building performance design solutions at multiple locations.Office of NEPA Policy and Compliance
-
November 17, 2025Cleanup Progress Reports are an annual publication to update the public on OREM cleanup progress across the Oak Ridge Reservation.Oak Ridge Office of Environmental Management
-
DocumentNovember 17, 2025Oak Ridge Office of Environmental Management
-
ArticleNovember 17, 2025Read the 2025 edition of the Cleanup Progress Report to learn about the Oak Ridge Office of Environmental Management's ongoing and recently completed projects.Oak Ridge Office of Environmental Management