More Resources

  • December 20, 2001
    Value Engineering is a recognized management tool which, if properly implemented and executed, can streamline operations, improve quality, and reduce costs. Through the use of methodologies such as Value Engineering, Federal agencies are realizing an average of more than $20 in savings/costs avoidance for each dollar spent on performing the value effort.
    Office of Inspector General
  • December 20, 2001
    Follow-on Inspection of the Department of Energy’s Value Engineering Program
    Office of Inspector General
  • December 18, 2001
    A prime purpose of the Department of Energy’s (Department) Stockpile Stewardship Program is to maintain a “high confidence” in the nuclear weapons stockpile so that the Department can certify to the President that there is no need to resume underground testing. To fulfill the responsibility for the annual reporting and certification requirement, the Directors of the three Department nuclear weapons laboratories annually assess and report the condition of the weapon systems for which their laboratories are responsible. The laboratory Directors rely on a robust alternative program for “science-based” weapons evaluation. The overall performance of the Department’s Stockpile Stewardship Program is one of its highest national security priorities.
    Office of Inspector General
  • December 18, 2001
    Management of the Stockpile Surveillance Program’s Significant Finding Investigations
    Office of Inspector General
  • December 17, 2001
    OBJECTIVE. To establish the responsibilities and requirements for Department of Energy (DOE) action required to make management decisions on Office of Inspector General (OIG) audit and public inspection reports.
    Office of Inspector General
  • December 17, 2001
    OBJECTIVE. To establish the responsibilities and requirements for Department of Energy (DOE) action required to make management decisions on Office of Inspector General (OIG) audit and public inspection reports.
    Office of Inspector General
  • December 14, 2001
    Vegetation Management along the Chehalis-Mayfield No. 1 230 kV Transmission Line Right of Way and the Mossy Rock–Chehalis Transmission Line Right of Way, between 7/1 to 27/10. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 162 feet.
    Office of NEPA Policy and Compliance
  • December 14, 2001
    Vegetation Management along the Chehalis-Mayfield No. 1 230 kV Transmission Line ROW and the Mossy Rock–Chehalis Transmission Line ROW, between 7/1 to 27/10. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 162 feet.
    Office of NEPA Policy and Compliance
  • December 14, 2001
    Transmission System Vegetation Management Program
    Office of NEPA Policy and Compliance
  • December 12, 2001
    Office of NEPA Policy and Compliance