Download the Job Aid 2-6: Seal Electrical and Other Penetrations in Attic.
Weatherization Assistance Program
July 1, 2024This job aid aligns with the Air Seal Attic Floor Badge in the Retrofit Installer Badges. It also aligns with Standard Work Specifications 3.0101.1, 6.0201.1, and 6.0201.2.