RSS

Workers for the deactivation and decommissioning prime contractor at the Portsmouth Site recently celebrated 4 million safe work hours without a lost.

EM’s Portsmouth/Paducah Project Office is installing the water treatment system for its On-Site Waste Disposal Facility.

EM’s Paducah Site has been the safe operation of the system to treat and reduce groundwater contamination.
Additional air monitoring stations are being installed that will enhance environmental and radiological data collection during demolition.

The first shipment of depleted uranium oxide (DUO) product recently left the Paducah Site in Kentucky and safely reached its final destination.

EM's Paducah Site recently removed approximately 42 percent of the site’s enriched uranium inventory with a shipment of cold traps.

While adapting operations due to the COVID-19 pandemic, EM has continued closing in on a key 2020 priority to begin demolition at the Portsmouth Site.

A virtual science, technology, engineering, and math camp supported by a grant from EM was conducted recently.

The U.S. Department of Energy today issued a formal Record of Decision (ROD) for the safe shipment and disposal of depleted uranium oxide.

Paducah Site clears infrastructure to facilitate investigation in preparation for demolition of the C-400 Building.