CX-035369: 2025 Path 15 Access Road Repairs

The project involves grading 11.35 miles of existing access roads along WAPA's Path 15 transmission line where they have become rough or developed …

Office of NEPA Policy and Compliance

February 11, 2026
minute read time

The project involves grading 11.35 miles of existing access roads along WAPA's Path 15 transmission line where they have become rough or developed rills or gullies in the roadway. Typical equipment for the project includes one road grader, one excavator, one dump truck, one small tractor with frontend loader and box grader attachment, one roller, water trucks, and a trailer to haul equipment.