CX-032782: Remove/Replace Walls at 772-7B

This EEC describes the activities required for the safe removal of the existing wall panels in the 772-7B room 10 boat storage on the North, South …

Office of NEPA Policy and Compliance

December 3, 2023
minute read time

This EEC describes the activities required for the safe removal of the existing wall panels in the 772-7B room 10 boat storage on the North, South and West walls and to install 3/8" wood panels as a replacement of them.