CX-032782: Remove/Replace Walls at 772-7B

This EEC describes the activities required for the safe removal of the existing wall panels in the 772-7B room 10 boat storage on the North, South …

Office of NEPA Policy and Compliance

December 3, 2023
Estimated Read Time   min

This EEC describes the activities required for the safe removal of the existing wall panels in the 772-7B room 10 boat storage on the North, South and West walls and to install 3/8" wood panels as a replacement of them.